How long does it take to get Coffee Wood Marble delivered?
Reference photographs. They show the material and the finish; they are not photographs of goods we made, and the colour on screen is not a colour-match.
The figures, and where each one comes from
| Order | What has to happen first | What we can say |
|---|---|---|
| Stock slabs | Block selection | About two weeks to a month |
| Cut-to-size | Drawing approval, then cutting and polishing | Three to four weeks |
| A project | Shop drawings, samples, book-match selection | All of the above and the shipping |
Why it behaves the way it does
The stone is not the slow part. What is slow is agreeing the figure, and a project that wants the panels to match has to be in that conversation before anything is cut.
What these figures are, and what they are not
We give a date against a specification, a quantity and a destination. We do not publish a lead time because the three numbers change it.
If you are specifying this
We have not published products against this question yet. Send us the process, thickness and quantity and we will quote it against what we can actually form, rather than against a catalogue.
It depends on what is being made and where it is going. Stock slabs move fastest. Cut-to-size adds the cutting and polishing, and a project adds the approval time on the drawings, which is usually the longest part of it and is not ours to shorten.
The figures
| Order | What has to happen first | What we can say |
|---|---|---|
| Stock slabs | Block selection | About two weeks to a month |
| Cut-to-size | Drawing approval, then cutting and polishing | Three to four weeks |
| A project | Shop drawings, samples, book-match selection | All of the above and the shipping |
Why
The stone is not the slow part. What is slow is agreeing the figure, and a project that wants the panels to match has to be in that conversation before anything is cut.
What these figures are, and what they are not
We give a date against a specification, a quantity and a destination. We do not publish a lead time because the three numbers change it.