How long does it take to get Coffee Wood Marble delivered?

It depends on what is being made and where it is going. Stock slabs move fastest. Cut-to-size adds the cutting and polishing, and a project adds the approval time on the drawings, which is usually the longest part of it and is not ours to shorten.
A row of roughly six squared stone blocks standing in the sand at the foot of a quarry, each one cut flat and marked with a red number on its face. Behind them the quarry is cut into benches up the hillside, and wind turbines stand on the ridge above under a blue sky.
The cutting floor at the quarry, with the sawn blocks standing in the sand.
A quarry face with the beds marked up by hand in coloured paint. Reading from the top the marks say: 1 white vein, 2 elegant black, 3 grey wood grain, 4 coffee, 5 elegant black, 6 elegant black, 7 black and white, with the red outline around the overburden at the top of the face. Coffee Wood Marble is the fourth bed down.
The face of the quarry with the beds marked in the field.
Marble slabs standing upright on wooden frames inside the open back of a shipping container, strapped and ready to load
Slabs loaded for shipment.

Reference photographs. They show the material and the finish; they are not photographs of goods we made, and the colour on screen is not a colour-match.

The figures, and where each one comes from

Order What has to happen first What we can say
Stock slabs Block selection About two weeks to a month
Cut-to-size Drawing approval, then cutting and polishing Three to four weeks
A project Shop drawings, samples, book-match selection All of the above and the shipping

Why it behaves the way it does

The stone is not the slow part. What is slow is agreeing the figure, and a project that wants the panels to match has to be in that conversation before anything is cut.

What these figures are, and what they are not

We give a date against a specification, a quantity and a destination. We do not publish a lead time because the three numbers change it.

If you are specifying this

We have not published products against this question yet. Send us the process, thickness and quantity and we will quote it against what we can actually form, rather than against a catalogue.

Send a specification Ask for a sample

It depends on what is being made and where it is going. Stock slabs move fastest. Cut-to-size adds the cutting and polishing, and a project adds the approval time on the drawings, which is usually the longest part of it and is not ours to shorten.

The figures

Order What has to happen first What we can say
Stock slabs Block selection About two weeks to a month
Cut-to-size Drawing approval, then cutting and polishing Three to four weeks
A project Shop drawings, samples, book-match selection All of the above and the shipping

Why

The stone is not the slow part. What is slow is agreeing the figure, and a project that wants the panels to match has to be in that conversation before anything is cut.

What these figures are, and what they are not

We give a date against a specification, a quantity and a destination. We do not publish a lead time because the three numbers change it.

Where this applies on this site